What a FOTON Tunland pickup costs — and how to get a firm price
How much does a FOTON Tunland pickup cost for export?
There is no published price list: every FOTON Tunland export order is quoted individually, because the same truck costs differently depending on the destination port, the emission standard required there, the steering side, the configuration and the order quantity. A firm FOB or CIF price, including the container maths, is returned of an enquiry.
The three details that move the number most are the destination port, the emission standard your market accepts, and how many units fit a 40′HQ container — two or three depending on the model.
You will not find a price list on this page, and that is deliberate. An export pickup is quoted per order, because the same truck costs different amounts depending on your port, your emission standard, your steering side and your order size. A published number would be wrong for almost everyone who read it.
What this page does instead is show you exactly what goes into the number, so you can see whether a quote you receive is complete — and so you can tell us three things and get a firm figure back the same working day.
What your quotation is built from
Every quotation we send is made of the same five parts. If a quote you receive is missing one of them, ask about it before you compare it with another.
| 1. Vehicle specification | The configuration itself: model line, cab type, engine, transmission, drive, emission standard, left- or right-hand drive. Two trucks that look identical in a photograph can differ by several thousand dollars in configuration. |
|---|---|
| 2. Incoterm | FOB Qingdao or Shanghai — the price ends when the container is loaded on board. CIF your port — the price includes ocean freight and insurance to the destination port named in your quote. Ask which one you have been given; they are not comparable. |
| 3. Shipping basis | Vehicles ship in 40′ High Cube containers. Tunland G7, Tunland S and Tunland E load three units per container; all other models load two. This is the single largest lever on your landed cost per truck. |
| 4. Payment terms | 30% deposit on order and 70% balance against a copy of the Bill of Lading — or an irrevocable Letter of Credit at sight. Your bank charges for the L/C are yours; ours are ours. |
| 5. Destination requirements | Anything your customs authority requires that is not standard: a conformity certificate, specific labelling, a pre-shipment inspection. These are quoted as part of the price, not added later. |
Looking for a specific market? See pickup trucks for Kenya — right-hand drive from the factory, delivered to Mombasa, with the Kenyan tax rates that apply on landing.
Why we cannot publish one number
Three dealers in three countries ordering the same Tunland G7 will receive three different figures, and none of them is wrong. The differences come from:
- Distance and route. Ocean transit runs 25–45 days depending on the destination port, and freight is priced accordingly.
- Emission standard. Markets differ on what they admit, and the configuration that satisfies one authority is not always the cheapest one built.
- Steering side. Left-hand drive is standard; right-hand drive is available on request and is produced to order.
- Order size. Consolidating a container changes the per-unit cost materially — see the container maths below.
- Currency. We quote in USD, EUR or CNY. Which one suits you depends on where you are paying from and what your bank charges for the conversion.
The container maths, because it is where most of the cost sits
This is the part buyers most often get wrong when comparing quotes from different suppliers.
| Container | 1 × 40′ High Cube |
|---|---|
| Loading — Tunland G7, Tunland S, Tunland E | 3 units |
| Loading — all other models | 2 units |
| Minimum order | 1 unit — we will ship a single truck in a full container if that is what you need |
| Loading method | Driven or forklifted in, wheels strapped and chocked, battery disconnected, fuel reduced to minimum |
A quote given as “per unit” only means something once you know how many units are in the container. Two suppliers can quote the same per-unit figure and deliver very different landed costs, simply because one of them is fitting two trucks where the other fits three.
What happens between your enquiry and your price
- You send three things: the destination country and port, the quantity you are considering, and any specification requirement your market imposes. If you do not know the specification yet, say so — we will tell you what your market normally admits.
- We confirm the configuration that fits those requirements, and flag anything that would change the price before we quote it rather than after.
- You receive a firm FOB or CIF figure , Monday to Saturday. Overnight enquiries are answered the next morning.
- If you need a formal offer for a bank or an import licence, tell us and we will issue it in the format your bank requires.
There is no obligation at any point in that sequence, and no account to create.
After the order, this is what arrives
So that you can price the whole transaction rather than just the truck, every shipment includes:
| Documents | Commercial invoice · Packing list · Bill of Lading (original, couriered) · Certificate of Origin · COC / COP conformity certificate where the destination requires it · Full VIN list matched to the loading photographs · Manufacturer warranty booklet |
|---|---|
| Production lead time | 20–30 days after deposit received |
| Ocean transit | 25–45 days depending on destination port |
| Loading port | Qingdao or Shanghai, China |
| Warranty | With the manufacturer’s warranty — terms confirmed by destination country and model at quotation |
What we do not include
Stated plainly, because a quote that hides these is not a cheaper quote:
- Import duty, VAT and customs clearance at your end. These are set by your authority, are payable by you, and vary enormously by country. We will tell you what the documents need to show; we cannot tell you what your government will charge.
- Inland transport from your port to your premises.
- Registration and road-worthiness testing in your market.
Three things to send us
Destination country and port, quantity, and any specification your market requires. That is enough for a firm figure — not a range, not a “contact us for pricing”.
Send three things and you get a firm figure, not a range.
Destination country and port, the quantity you are considering, and any specification your market requires. We reply with FOB and CIF pricing, Monday to Saturday.
Where the number comes from


