This page explains what happens on the Chinese side between your deposit and the vessel departure — so you can check that your supplier is actually doing it.
1. Contract and production slot
After the proforma invoice is confirmed and the deposit received, the vehicle enters production (or is allocated from stock). Typical production time for stock models is 20–30 days; custom bodywork and large fleets take longer.
2. Pre-delivery inspection (PDI)
Before loading: function checks, fluids, tyre pressure, accessory check, VIN recording, and photo documentation. Buyers should require: PDI checklist + photos + VIN list matching the invoice.
3. Export customs declaration (China side)
The exporter (or its customs broker) declares the vehicles for export. The declaration must match the commercial invoice: model, quantity, value, destination. Errors here create document mismatches at destination — the most common cause of clearance delays.
4. Pre-shipment inspection / certification (if required by destination)
Many African destinations require PVoC/COC-type inspection by an accredited agency before loading. The supplier must book it; the certificate is issued against the invoice and packing list. Confirm the requirement for your country before production, not after.
5. Certificate of origin (CO)
Issued by the China Council for the Promotion of International Trade (CCPIT) or the customs authority, depending on the certificate type. The CO must match the invoice and B/L — importers use it for duty preference schemes where applicable.
6. Port handling and loading
Vehicles are moved to Qingdao or Shanghai (or another port of loading), loaded into containers or onto RoRo vessels, and the bill of lading (B/L) is issued. Ask for the loading photos and the container/seal numbers.
7. Documents released to the buyer
After the balance is paid, the supplier releases the original B/L and the full document set (invoice, packing list, CO, inspection certificate, insurance certificate if CIF). The buyer’s broker uses this set to clear customs.
8. Timeline (typical, not a guarantee)
| Stage | Duration |
|---|---|
| Production (stock model) | 20–30 days |
| Inland transport + loading | 3–7 days |
| Ocean transit (China → West/East Africa) | 25–45 days |
| Documentation/telex release | 3–7 days |
Ask your supplier for a written schedule with the quotation.
Get a written FOB or CIF quotation
Tell us the destination port and quantity — we reply (Mon–Sat) with a written quotation and the export specification sheet.
Get my FOB/CIF quote · WhatsApp us · See models
Information on this page is general and current as of 2026-11-07. Country-specific rules change — confirm them with a licensed customs broker or the destination authority before you pay a deposit.